[1]宋庆伟,高纯友,张 晶,等. B 型地铁转向架构架结构优化及对比分析[J].机车电传动,2010,(02):1.[doi:10.13890/j.issn.1000-128x.2019.02.121]
 SONG Qingwei,GAO Chunyou,Zhang Jing,et al. Structural Optimization and Comparative Analysis of B-type Metro Bogie Frame[J].Electric Drive for Locomotives,2010,(02):1.[doi:10.13890/j.issn.1000-128x.2019.02.121]
点击复制

 B 型地铁转向架构架结构优化及对比分析()
分享到:

机车电传动[ISSN:1000-128X/CN:43-1125/U]

卷:
期数:
2010年02期
页码:
1
栏目:
城市轨道车辆
出版日期:
2010-03-10

文章信息/Info

Title:
 Structural Optimization and Comparative Analysis of B-type Metro Bogie Frame
作者:
 宋庆伟高纯友张 晶陈 卓魏 苇
 (中车长春轨道客车股份有限公司,吉林 长春 130062)
Author(s):
 SONG Qingwei GAO Chunyou Zhang Jing CHEN Zhuo WEI Wei
 ( CRRC Changchun Railway Vehicles Co., Ltd., Changchun, Jilin 130062, China )
关键词:
 地铁转向架构架动应力测试动力学性能结构优化有限元分析城市轨道交通仿真
Keywords:
 metro bogie frame dynamic stress test dynamic performance structural optimization finite element analysis urban railtransit simulation
分类号:
U231;U270.331
DOI:
10.13890/j.issn.1000-128x.2019.02.121
文献标志码:
A
摘要:
 针对某项目转向架构架使用寿命无法满足运营要求的情况,通过对线路动应力测试数据的时域图和频域图对比分析,提出优化结构方案,并运用理论计算、有限元分析以及实际运行线路的测试,对优化结构方案进行验证。优化结构关键部位测点应力大幅降低,所有测点等效应力均小于标准限度70 MPa,满足了车辆正常使用寿命的要求。
Abstract:
 According to the service life of bogie frame of a project can not meet the operation requirements, by comparing and analyzing the time-domain and frequency-domain diagrams of line dynamic stress test data, the optimal structure scheme was put forward. The optimized structure scheme was verified by theoretical calculation, finite element analysis and actual operation line test. The stress of the key parts of the optimized structure was greatly reduced, and the equivalent stress of all measuring points was less than the standard limit of 70 MPa, which met the requirements of normal service life of vehicles.

参考文献/References:

 [1]米彩盈. 铁道机车车辆结构强度[M]. 成都:西南交通大学出版社,2007.
[2]杨广雪. 某线路一期增购项目转向架动应力测试报告[R]. 北京:北京交通大学结构强度检测实验室,2016.
[3]杨广雪. 某线路项目转向架动应力测试报告[R]. 北京:北京交通大学结构强度检测实验室,2017.
[4]张晓艳. 某线路一期增购项目转向架构架强度计算报告[R].长春:中车长春轨道客车股份有限公司,2016.
[5]薛宁鑫. 某线路项目转向架构架强度计算报告[R]. 长春:中车长春轨道客车股份有限公司,2017.

相似文献/References:

[1]丁荣军,张志学,李红波. 轨道交通能源互联网的思考[J].机车电传动,2016,(01):1.[doi:10.13890/j.issn.1000-128x.2016.01.001]
 DING Rongjun,ZHANG Zhixue,LI Hongbo. An Overview on Rail Transit Energy Internet[J].Electric Drive for Locomotives,2016,(02):1.[doi:10.13890/j.issn.1000-128x.2016.01.001]
[2]周永刚,陈超录,刘 雄.地铁永磁直驱牵引系统设计方法[J].机车电传动,2015,(06):34.[doi:10.13890/j.issn.1000-128x.2015.06.009]
 ZHOU Yonggang,CHEN Chaolu,LIU Xiong.Metro Permanent Magnet Direct-driving Traction System Design Method[J].Electric Drive for Locomotives,2015,(02):34.[doi:10.13890/j.issn.1000-128x.2015.06.009]
[3]胡基贵,刘天赋. 从现代有轨电车技术的发展看中国研究方向[J].机车电传动,2016,(02):1.[doi:10.13890/j.issn.1000-128x.2016.02.001]
 Hu Jigui,Liu Tianfu. Technical Development Direction of China Modern Tramcar[J].Electric Drive for Locomotives,2016,(02):1.[doi:10.13890/j.issn.1000-128x.2016.02.001]
[4]刘雄,陈文光,许峻峰,等.地铁永磁直驱牵引系统优化策略与仿真分析[J].机车电传动,2016,(03):24.[doi:10.13890/j.issn.1000-128x.2016.03.006]
 LIU Xiong,CHEN Wenguang,XU Junfeng,et al.Optimizing Strategy and Simulation Analysis for Direct-drive Traction System of PMSM[J].Electric Drive for Locomotives,2016,(02):24.[doi:10.13890/j.issn.1000-128x.2016.03.006]
[5]庞艳凤,袁月赛.地铁再生能量利用方案比较[J].机车电传动,2014,(01):77.[doi:10.13890/j.issn.1000-128x.2014.01.020]
 PANG Yan-feng,YUAN Yue-sai.Comparison of Regenerating Energy Utilization Schemes in Urban Rail System[J].Electric Drive for Locomotives,2014,(02):77.[doi:10.13890/j.issn.1000-128x.2014.01.020]
[6]付 彬,罗世辉,刘晓宇,等. 带径向机构的铰接式单轴转向架独立轮对导向特点分析[J].机车电传动,2016,(05):1.[doi:10.13890/j.issn.1000-128x.2016.05.101]
 FU Bin,LUO Shihui,LIU Xiaoyu,et al. Steering Characteristic of Independent Wheelset of Articulated Single-axle Bogie with Radial Mechanism[J].Electric Drive for Locomotives,2016,(02):1.[doi:10.13890/j.issn.1000-128x.2016.05.101]
[7]倪大成,应 婷,张 宇. 机车牵引主电路接地检测回路共模电压研究[J].机车电传动,2016,(05):1.[doi:10.13890/j.issn.1000-128x.2016.05.105]
 NI Dacheng,YING Ting,ZHANG Yu. Research on Grounding-protection Equipment Common-mode Voltage of Electric Locomotive Traction Main Circuit[J].Electric Drive for Locomotives,2016,(02):1.[doi:10.13890/j.issn.1000-128x.2016.05.105]
[8]汤 永,李 辉,张 涛. 基于闭塞时间模型的列车追踪间隔时间研究[J].机车电传动,2016,(05):1.[doi:10.13890/j.issn.1000-128x.2016.05.104]
 Tang Yong,Li Hui,ZHANG Tao. Research on Train Headway based on Blocking Time Model[J].Electric Drive for Locomotives,2016,(02):1.[doi:10.13890/j.issn.1000-128x.2016.05.104]
[9]武学良,刘银涛,郝占红. 电力机车牵引电机通风系统比较[J].机车电传动,2016,(05):1.[doi:10.13890/j.issn.1000-128x.2016.05.103]
 WU Xueliang,LIU Yintao,HAO Zhanhong. Summarization of Electric Locomotive Traction Ventilation System[J].Electric Drive for Locomotives,2016,(02):1.[doi:10.13890/j.issn.1000-128x.2016.05.103]
[10]张兴宝. 地铁列车制动距离及制动减速度相关问题研究[J].机车电传动,2016,(05):1.[doi:10.13890/j.issn.1000-128x.2016.05.107]
 ZHANG Xingbao. Research on the Related Problems of Braking Distance and Deceleration of Metro Trains[J].Electric Drive for Locomotives,2016,(02):1.[doi:10.13890/j.issn.1000-128x.2016.05.107]
[11]董利芳,穆俊斌,张 闯,等. 基于均值法的地铁网络通信配置方案设计[J].机车电传动,2016,(05):1.[doi:10.13890/j.issn.1000-128x.2016.05.106]
 DONG Lifang,MU Junbin,ZHANG Chuang,et al. Design of Metro Network Communication Configuration based on Mean Value[J].Electric Drive for Locomotives,2016,(02):1.[doi:10.13890/j.issn.1000-128x.2016.05.106]

备注/Memo

备注/Memo:
 作者简介:宋庆伟(1983-),男,高级工程师,主要从事地铁车辆转向架的研发工作。
更新日期/Last Update: 2019-03-08